Installation of 2 Biomass Boilers and Extension of 2 Sheds
Installation of 2 Biomass Boilers and Extension of 2 Sheds
Local planning applications near Peterhead
Installation of 2 Biomass Boilers and Extension of 2 Sheds
Erection of Shed (Class 6 - Storage and Distribution)
Consultation under Section 37 of The Electricity Act 1989 for the Installation of 400KV Overhead Lines, 18 Steel Lattice Towers, 2 Temporary Towers and Associated Infrastructure
Installation of 33kV Overhead Line supported by Wooden Poles (Amendment to APP/2025/1032)
Erection of 2 Agricultural Cattle Sheds
Existing overhead 33kv line connecting Boddam from Strichen. At Pole 17 we are required to move the position slightly and add an additional 3 pole spur with two new stays.
Existing Use - Ready Mix Concrete Plant, Staff Welfare Facilities, Site Office and Associated Infrastructure (Access, Parking and Truck Turning)
Extension to Golf Driving Range, Installation of Solar Panels and Creation of 7 Additional Parking Spaces
Installation of 1000 Megawatt (MW) Battery Energy Storage System and Associated Infrastructure
Erection of Gospel Hall (Class 10)
Demolition of Dwellinghouse
Alterations and Change of Use from Community Centre (Class 10) to Dwellinghouse (Class 9)